Some more images of the building progress have just come in.  Windows are being put in to the buildings now and the plastering has begun on the outside walls.

b3_b3_

Here you can see that the outside walls are now being plastered with a dusty brown colour,

b1_lab_plaster_2b1_lab_plaster_2

b2_lab_pipingb2_lab_piping

Electrical conduits is being put in to the walls before the plaster work is begun inside.

b5_visitors_messb5_visitors_mess

This is the back of the mess area for visitors. The front of this building looks across the Turkwel river and the fossil exposures.

a5_guest_mess_walls_6a5_guest_mess_walls_6

This is the front and inside open sitting area of the visitor mess.
This building also contains the kitchen and store, conference are and  bathroom facility at the back.

 


Comments
Add New Search
Name:
Email:
 
Title:
 
Please input the anti-spam code that you can read in the image.

3.26 Copyright (C) 2008 Compojoom.com / Copyright (C) 2007 Alain Georgette / Copyright (C) 2006 Frantisek Hliva. All rights reserved."

More about our research: