04 March 2009
Posted in
Science & Research
b3_
Here you can see that the outside walls are now being plastered with a dusty brown colour,
b1_lab_plaster_2
b2_lab_piping
Electrical conduits is being put in to the walls before the plaster work is begun inside.
b5_visitors_mess
This is the back of the mess area for visitors. The front of this building looks across the Turkwel river and the fossil exposures.
a5_guest_mess_walls_6
This is the front and inside open sitting area of the visitor mess.
This building also contains the kitchen and store, conference are and bathroom facility at the back.